20 oct
|
Linum Consult
|
Madrid
20 oct
Linum Consult
Madrid
Head of Data Centre Construction – Madrid
Linum Consult’s client is an international design and build main contractor, specialising in the construction of large commercial and industrial facilities for international blue‑chip clients. They are currently seeking a Country Manager from an EPC turnkey construction background to oversee their Data Centre division across Europe, based in Madrid.
Responsibilities
- Ensuring the performance, design development, and client satisfaction from pre‑construction through to project completion
- Collaborating closely with multidisciplinary international teams, managing the technical and commercial elements, and playing a pivotal role in maintaining and growing client relationships
- Directing and coordinating design activities, including optimising technical solutions, controlling project milestones, and supporting technical excellence
- Acting as the main point of contact for clients, leading change management, and ensuring client satisfaction throughout the project life cycle
- Leading cross‑functional international design and project teams,
ensuring effective collaboration between all stakeholders
- Partnering with local project teams during the execution phases, maintaining alignment between design intent and construction delivery
Profile
- Master’s degree qualification in Civil Engineering, Urbanism, Mechanical or Electrical Engineering, or a similar field
- At least 10 years’ experience within the EPC turnkey construction industry, with a history of working on highly‑technical large data centre projects
- Strong background of overseeing EPC activities
- Exposure to M&E; project management would be advantageous
- Strong leadership and communication skills
- Fluent in spoken and written Spanish and English
- A history of working for either main contractors or engineering consultancies, with an established network of contacts within Spain to help develop the business
- The right to live and work in the EU and travel frequentl
📌 Head of Data Centre Construction (Madrid)
🏢 Linum Consult
📍 Madrid