-Support subsea cable projects (AC and HVDC) with cable engineering, design, technology and manufacturing know -how
-Develop HV cable specifications for inner array or export cable systems
-Review cable design and manufacturing documents
-Prepare and attend supplier and factory audits as well as cable type tests, and support the cable manufacturing supervision
-Backoffice engineering for NCR and punch items from the cable manufacturing process
-Manage the interface to the cable installation
-Identify and report technical risks
-Contribute to the overall optimization of inner array grid layouts and export cable connections for offshore wind farms
-Report to package and/or project managers and liaise with colleagues from other work
📌 Senior Project Engineer for AC and HVDC Subsea Cable Technology (Madrid)
🏢 Fichtner
📍 Madrid
Postulate a este anuncio
Muestra tus habilidades a la empresa, rellenar el formulario y deja un toque personal en la carta, ayudará el reclutador en la elección del candidato.