12 sep
|
Metric DCX
|
Madrid
Metric Dcx is seeking a Construction Director to oversee hyperscale data centre projects across EMEA.
No espere a enviar su solicitud después de leer esta descripción;
se espera un gran volumen de candidaturas para esta posibilidad.
This senior leadership role drives construction strategy, contractor performance, and operational excellence from pre-construction through commissioning and handover. xhfqzwm
You will lead multiple projects, manage General Contractors, coordinate with Development, Design, Engineering, Procurement, and Operations, and report to senior leadership with forecasts and risk insights.
#J-18808-Ljbffr
📌 Director Of Hyperscale Data Centre Construction (Madrid)
🏢 Metric DCX
📍 Madrid