Head of Data Centre Construction (Madrid)

Head of Data Centre Construction (Madrid)

18 ago
|
Linum Consult
|
Madrid

18 ago

Linum Consult

Madrid

Head of Data Centre Construction – Madrid

Linum Consult’s client is an international design and build main contractor, specialising in the construction of large commercial and industrial facilities for international blue‑chip clients. They are currently seeking a Country Manager from an EPC turnkey construction background to oversee their Data Centre division across Europe, based in Madrid.

Responsibilities

- Ensuring the performance, design development, and client satisfaction from pre‑construction through to project completion
- Collaborating closely with multidisciplinary international teams, managing the technical and commercial elements, and playing a pivotal role in maintaining and growing client relationships
- Directing and coordinating design activities, including optimising technical solutions, controlling project milestones, and supporting technical excellence
- Acting as the main point of contact for clients, leading change management, and ensuring client satisfaction throughout the project life cycle
- Leading cross‑functional international design and project teams, ensuring effective collaboration between all stakeholders
- Partnering with local project teams during the execution phases,



maintaining alignment between design intent and construction delivery

Profile

- Master’s degree qualification in Civil Engineering, Urbanism, Mechanical or Electrical Engineering, or a similar field
- At least 10 years’ experience within the EPC turnkey construction industry, with a history of working on highly‑technical large data centre projects
- Strong background of overseeing EPC activities
- Exposure to M&E; project management would be advantageous
- Strong leadership and communication skills
- Fluent in spoken and written Spanish and English
- A history of working for either main contractors or engineering consultancies, with an established network of contacts within Spain to help develop the business
- The right to live and work in the EU and travel frequently within Europe

Application Process

If you fulfil the minimum requirements stipulated by our client and are confidentially interested in applying, then please drop Linum Consult a line with a copy of your CV and contact details to for the attention of Neill Donald.

#J-18808-Ljbffr

📌 Head of Data Centre Construction (Madrid)
🏢 Linum Consult
📍 Madrid

Postulate a este anuncio

Muestra tus habilidades a la empresa, rellenar el formulario y deja un toque personal en la carta, ayudará el reclutador en la elección del candidato.

Suscribete a esta alerta:

Recibe por email las nuevas ofertas de trabajo para: head of data centre construction (madrid) / madrid