July 27th, 2026, 12:0 - 13:00 local timeScope of work:Identify the new ISP circuit handoff at the nnect the circuit to the underlay link deployed by the ISP.Verify link status and physical ordinate with the remote network team for connectivity testing.Perform basic checks (LED status, cable reseating, power cycling if required).Confirm that the circuit is fully operational.Tools to carry:USB to RJ45 console cableUSB-A to USB-C console cable or USB-C to USB-C cable (based on laptop compatibility)Wi-Fi dongle (with stable connectivity)Laptop with MS Teams and Pu TTY installed