04 ago
|
Teceze
|
País Vasco
ppJuly 27th, 2026, 12:0 - 13:00 local time /p pbScope of work: /b /p pIdentify the new ISP circuit handoff at the site. /p pConnect the circuit to the underlay link deployed by the ISP. /p pVerify link status and physical connectivity. /p pCoordinate with the remote network team for connectivity testing. /p pPerform basic checks (LED status, cable reseating, power cycling if required). /p pConfirm that the circuit is fully operational. /p pbTools to carry: /b /p pUSB to RJ45 console cable /p pUSB-A to USB-C console cable or USB-C to USB-C cable (based on laptop compatibility) /p pWi-Fi dongle (with stable connectivity) /p pLaptop with MS Teams and PuTTY installed /p /p #J-18808-Ljbffr
📌 New ISP Circuit Installation Support (País Vasco)
🏢 Teceze
📍 País Vasco